Chaining the direction of the graph view arrow but keeping the way of linking

What I’m trying to do

Instead of always go back in top top level file to linking it to the middle level file (so that I have the arrow in the graph view pointing in the right direction). I would like to directly connect the top level to the middle level file in the middle level file via linking the top level not as a result out of the middle level instead as a requirement. So I wouldn’t have to always switch to the top level file.

I would love to have a option to just switch that setting. Is there any pluging

Result should look like:

Way of Obsidian:







My preferred way:



Things I have tried

  1. changing my way of thinking but it just not making sense. Because even if I now link the middle level as a result out of top level, I would have to know the result in dem moment where I am creating the origin. And know the result out of the middle level in the moment where I am specify the middle level.

  2. I also don’t found plugins, or ways with css to solve.

  3. The only way to do this would be to create a python script with is rewriting the top level file after I created the middle level automatically.